Αφοί Θεοδώρου OE

Τεχνική Εταιρία

    • Contrast
    • Layout
    • Font

EYATH S.A. – MEDIUM VOLTAGE SUBSTATION MAINTENANCE FOR ONE YEAR
HEDNO S.A.

WORKS ON THE ELECTRICITY METER, REGIONAL DIRECTORATE OF ATTICA, PREFECTURE OF ATTICA)
WORKS ON THE ELECTRICITY METER, REGIONAL DIRECTORATE OF ISLANDS, PREFECTURE OF HERAKLION, CRETE)
WORKS ON THE ELECTRICITY METER AND COUNTING OF ELECTRICITY METERS (REGIONAL DIRECTORATE OF MACEDONIA-THRACE, PREFECTURE OF HALKIDIKI)

HEDNO S.A. – WORKS AT THE ELECTRICITY METER & REMOTE METER AT THE REGIONAL DIRECTORATE OF MACEDONIA-THRACE (CENTRAL THESSALONIKI, PREFECTURE OF HALKIDIKI, PREFECTURE OF VERIA, PREFECTURE OF RHODOPE, PREFECTURE OF KASTORIA

FIRST 20-HOME COMMUNITY– IN THE MUNICIPALITY OF PALLINI, HALKIDIKI (WITH WATER SUPPLY – SEWAGE – ELECTRICITY – TELEPHONE NETWORKS)
IN THE BROADER AREA OF NEA KALLIKRATEIA, HALKIDIKI (3 MAISONETTES HAVE BEEN DELIVERED)
INTERBETON SA – REPLACEMENT OF MEDIUM VOLTAGE SUBSTATION (FLOGITA, HALKIDIKI)

  • 1(current)
  • 2